Skip to main content
Back to the list of Connectors Connect Jira Cloud to Artemis to ingest Jira issues into your knowledge base. The connector supports filtering by project, issue metadata, and modification date, with optional ingestion of issue comments. It also supports Jira permission-aware access control (ACL) to ensure users only retrieve content they are authorized to access.

Prerequisites

Before configuring the connector, ensure you have:
  • Administrator access to the Jira Cloud site.
  • A Jira OAuth application or supported authentication credentials.
  • A configured Jira Authentication Profile in the platform.
  • Access to the Jira projects that you want to ingest.

Configure the Jira connector

Connection Settings

Use the Connect a Jira Cloud Site section to establish the connection.

Projects and filters

Use this section to limit the scope of content ingestion.
Note: Project keys define the primary source boundary. Optional filters further reduce the issues that are synchronized.

Objects and child resources

Choose which Jira objects to synchronize. Note: Child resources (Comments, Attachments, and Worklogs) are synchronized only when enabled.

Advanced JQL

Use Advanced JQL to define additional Jira Query Language (JQL) filters. The specified JQL is combined with the selected project scope and optional filters during synchronization. Example:

Permission-aware ACL

Enable Permission-aware ACL to preserve Jira access permissions in the search index. When enabled:
  • Jira issue visibility is synchronized with the indexed documents.
  • Search results are filtered based on each user’s Jira permissions.
  • The connector fails closed if document visibility cannot be determined.
When available, ACL evidence is projected from Jira entities such as:
  • Assignee
  • Reporter
  • Watchers
Only users associated with an issue through one of the entities listed above can view that issue in search results.

Review and activate

  1. Generate a proposal to review the scope of synchronization.
  2. Run a Dry run to validate the configuration and preview the synchronized content.
  3. Click Approve & Sync to activate the connector.